External Inspection

External inspection are required every two (2) years from date of commissioning. 

SCOPE OF WORK:

  • Clean Vessel.

  • Record all data information.

  • Check all welds & fittings for leaks.

  • Check operation of SRV and Pressure Gauge.

  • Check drain.

  • Check if Vessel is bolted down.

  • Record NDT measurements. 

  • Issue Compliance Certificate. 

internal inspection.jpg

Internal Inspection

Internal Inspections are required every four (4) years from date of commissioning. 

 

SCOPE OF WORK:

Includes External Inspection with addition of the following:

  • Isolate and drain the unit. 

  • Remove and replace Safety Relief Valve.

  • Access the Vessel internally and view the internal condition and welds.

  • Clean the Vessel internally.

  • Replace all gaskets/fittings used to access the Vessel.

  • Start compressor and record operating pressures. 

  • Record NDT measurements.

  • Issue Compliance Certificate. 

black tank.jpg

Safety Relief Valve Testing And Certification

Conformance to Australian Standard AS1271-2003 and the provisions of the ASME Boiler & Pressure Vessel Code Section VIII Division 1.

Scope of work:

We understand the importance of having plant that is utilised in a variety of ways operate as it should in the workplace - which is why we offer our safety relief valve testing and certification both onsite and offsite. 

We minimise downtime and increase confidence by testing and certifying a range of safety relief valves on site, which are then issued with a certificate of conformance. 

IMG_2947.HEIC

.

.

ABN: 16 720 522 874

  • Instagram
  • Facebook
  • Linkedin
bottom of page